Beach to Beach Walk Connectivity Improvements COMPLETED
Allocation: $300,000
Connectivity to the Beach to Beach Walk and Island Sanctuary – two of our local tourism drawcards – was improved through a $300,000 investment. These funds provided for the construction of additional footpath connections to the Beach to Beach Walk, as well as the improvement of access into the Island Sanctuary.